Gas turbine guide

Used and New Gas Turbines for Africa

When to buy used, when to buy new, and how to run both on one master plan.

Most African power projects need both speed and long-term standardisation. Used turbines deliver speed. New turbines deliver standardisation and the latest designs. The best master plans use each where it fits.

Used gas turbines: verify first

Verified used and surplus turbines from USP&E inventory can deliver power months or years sooner than a new order. Verification means clear ownership, documented history, inspection and, where needed, refurbishment before shipping. Read more about used gas turbines.

New gas turbines: standardise and reserve slots

New turbines give you full OEM support, current designs and a fleet that is the same machine at every phase. The new modular Modular Gas Turbine is available with capacity slots from 2028. Read more about new gas turbines.

Decision matrix

Question Used or surplus New
Need power within months? Strong fit Usually too slow
Long-term fleet standard? Possible, case by case Strong fit
Budget pressure now? Lower upfront cost Higher upfront cost
Lender requirements? Needs full records OEM warranty helps

Sequence used and new on one plan

  1. Map load growth and redundancy over ten years.
  2. Energise phase one with verified available units.
  3. Reserve space, grid capacity and fuel for later blocks.
  4. Order or reserve new units for the growth phases.
  5. Keep voltage, frequency and controls consistent across all phases.
  6. Run the whole fleet under one O&M programme.

Logistics and gas

Heavy lifts, ports and wet-season roads affect both paths. So does gas: confirm supply before committing, and use dual-fuel units or a diesel bridge if gas is late.

Track record

150+

power projects in 45+ countries

25,000 MW

contracted since 2002

400+

engineers and project managers

Plan your growth phase with the modular gas turbine

If your load will grow in phases, plan the later blocks now. The New USP&E FX-45 45MW Modular Gas Turbine for the Hyperscale Data Center sector in the USA, with slots from 2028 to 2030.

45MWModular Gas Turbine
2028–2030Slots
USAHyperscale data center sector

Start on available equipment today, reserve the pad, interconnection and fuel capacity, and the modular gas turbine phase plugs in instead of starting over. See the modular gas turbine at a glance.

Why owners choose USP&E

150+Power projects in 45+ countries
25,000 MWContracted since 2002
ISO9001 & 45001 certified

USP&E is a full-service engineering, EPC and O&M company, not a broker. One team designs, builds and runs your plant, so nothing falls between contracts.

Common questions

Should we choose used or new gas turbines?

Used units suit fast timelines and tighter budgets; new units suit long-term standardisation. Many projects use both.

What makes a used turbine safe to buy?

Verified ownership, complete records, inspection, refurbishment where needed and installation under a proper EPC contract.

Can a remanufactured Frame 6B be part of the plan?

Yes. USP&E remanufactures GE Frame 6B units to zero hours in-house.

Who owns EPC across both?

USP&E can deliver EPC and O&M across used and new phases as one programme.

Facing a power challenge in Africa?

Tell us your load, fuel and timeline. An engineer will come back with options, not a sales pitch.

Where we operate

USA | AFRICA | UK | UAE | CHINA

USP&E United States

Colorado Springs Office: 1755 Telstar Dr, Suite 300

Knoxville Office: 800 S Gay St, Suite 700

USP&E South Africa

Johannesburg Office: 22 Kildoon Rd, Bryanston

Cape Town Office: 31 Brickfield Road, Woodstock

USP&E United Kingdom

London Office: 162-168 Regent Street

USP&E China

China Office: No. 1, Ningzhou Road, Wuxi

Call:+27 10 822 2324  |  E:info@uspeglobal.com

ISO Certifications
ISO9001ISO45001

Powering Possibility. Built for the Frontier.
Full-service EPC & O&M. Not a broker.

© 2026 USP&E · Africa Generators is part of USP&E