The modular gas turbine at a glance
New and modular
A new gas turbine platform designed to be deployed in repeatable blocks, so every phase of your project uses the same machine, the same spares and the same playbook.
Hyperscale-ready
Built for data-centre campuses and industrial loads that grow in steps and cannot afford to stop.
50 Hz or 60 Hz
Configured for the dominant 50 Hz African grids, or 60 Hz where your plant, equipment fleet or standards call for it.
One accountable team
USP&E designs, builds and operates the plant around the modular gas turbine, so you are never left managing the gaps between suppliers.
Why modular matters in Africa
African load rarely arrives as one clean block on day one. Mines ramp in phases. Industrial parks fill over years. Data centres follow fibre and cooling. Modular 45 MW blocks let you match investment and grid connection to real demand, while keeping one standard way of operating and maintaining the fleet.
Start on available equipment today and add modular gas turbine blocks as demand grows. USP&E can energise your site from live inventory now and reserve modular gas turbine slots from 2028, with the same team owning both the bridge power and the long-term fleet.
What USP&E delivers around the modular gas turbine
Engineering
Feasibility and owner’s engineering for your fuel, altitude, ambient and grid conditions.
Procurement
Turbine blocks, switchgear, transformers, fuel systems and balance of plant, sourced and checked by one team.
Construction
Site management, QA/QC, commissioning and performance testing through to handover.
Operations & maintenance
Long-term O&M with remote monitoring, planned maintenance and training for your local workforce.
Who the modular gas turbine is for
- Mining companies planning power in phases for pits, mills and camps
- Utilities and IPPs building modular gas-to-power where gas is available
- Industrial and behind-the-meter developers who need N+1 redundancy at block level
- Data-centre and hyperscale teams entering African markets with phased capacity
- Lenders and offtakers who want one contractor accountable from equipment to O&M
Need power before 2028?
We are brand-agnostic. When a GE, Siemens, Solar, Wärtsilä, MAN or Caterpillar unit is the faster route to power for your site, we will recommend it. Many owners start on proven inventory and plan a modular gas turbine for the growth phase, so the bridge plant and the permanent fleet are designed together.
Why owners choose USP&E
USP&E is a full-service engineering, EPC and O&M company, not a broker. One team designs, builds and runs your plant, so nothing falls between contracts.
Track record
150+
power projects in 45+ countries
25,000 MW
contracted since 2002
400+
engineers and project managers
How to reserve modular gas turbine capacity
- Share your load profile, phasing, fuel and target dates with a USP&E engineer.
- Get a plant concept that combines near-term power with modular gas turbine blocks from 2028.
- Reserve capacity slots and lock the site layout, grid connection and fuel plan.
- USP&E builds, commissions and operates the plant, block by block.
Common questions
Is the modular gas turbine available for African projects?
Yes. The New USP&E FX-45 45MW Modular Gas Turbine for the Hyperscale Data Center sector in the USA is a new modular design with capacity slots from 2028 to 2030. USP&E delivers it with full EPC and O&M for projects in Africa and worldwide.
What output does the modular gas turbine deliver?
The New USP&E FX-45 45MW Modular Gas Turbine for the Hyperscale Data Center sector in the USA, with slots from 2028 to 2030.
Can the modular gas turbine run on a 50 Hz grid?
Yes. The modular gas turbine can be configured for 50 Hz or 60 Hz, so it suits African grids as well as 60 Hz plants and equipment fleets.
What if I need power before 2028?
Start with proven equipment from USP&E inventory and plan modular gas turbine blocks for the growth phase. One team designs both so they work together.
Who installs and maintains the modular gas turbine?
USP&E. We are a full-service engineering, EPC and O&M company, not a broker, so the team that builds your plant stays accountable for running it.
Facing a power challenge in Africa?
Tell us your load, fuel and timeline. An engineer will come back with options, not a sales pitch.