Mining power guide

Power Supply for Lithium Mines and Concentrators in Africa

Lithium projects across Africa have moved quickly from drilling to construction, and many of them sit far from a strong grid. A hard-rock lithium operation is mostly an open pit feeding a concentrator that crushes the ore, separates spodumene by density and flotation, then dewaters and dries the product for export. Each of those steps has its own electrical character.

The power plant has to follow that process from the first pilot module to full production, often while the owner is still raising finance for the next phase. This guide walks through the loads in a typical concentrator and the supply choices that tend to suit each stage of a lithium mine’s life.

How a lithium concentrator uses power

Compared with a gold leach plant, a spodumene concentrator has fewer very long, slow processes and more mechanical separation. Crushers, screens, dense media cyclones, flotation cells, thickeners, filters and dryers run in series. If one section stops, material backs up quickly, so the plant values steady voltage and frequency more than almost anything else.

The base load is fairly flat once the plant is stable, but start-ups after a stoppage bring large motors back one after another. That restart pattern, rather than the average demand, often sets the minimum number of generating units that must be online.

Crushing and screening

Primary jaw crushers and secondary and tertiary cone crushers are the largest individual motors in many concentrators. They start under load when a crusher has stopped with rock in the chamber, which makes the starting current much higher than on an empty machine. Soft starters or drives help, but the station still sees a sharp step.

Ask the process designer for the crusher motor ratings, starting method and the worst-case restart scenario. The power engineer can then check voltage dip and frequency recovery for each case, and decide whether the largest crusher should only start once a minimum number of engines is running.

Dense media separation and flotation

Dense media circuits rely on pumps that keep ferrosilicon suspended at a controlled density. If those pumps stop, the media settles and the circuit needs time and effort to recover. Flotation adds blowers and agitators that also run continuously. Together they form a block of load that should be protected during any shortfall in generation.

Group these drives so that the load shedding scheme can trip less sensitive consumers, such as stockpile reclaim or workshop loads, before it ever reaches the separation circuit. The ranking deserves the same care as the safety loads on any mine.

Dewatering, drying and product handling

Thickeners, filter presses and dryers prepare concentrate for trucking and export. Filters cycle on and off, and electric dryers or the fans on fuel-fired dryers add a further load that changes with moisture content. Conveyors and bagging or bulk loading complete the chain to the stockpile and truck bay.

These loads are less sensitive than separation but still matter for throughput. A short interruption is tolerable; repeated ones reduce output and can leave wet product that fails the export moisture limit.

Camp, water and services

Accommodation, kitchens, offices, laboratories, water treatment and borehole pumps sit alongside the plant. In remote areas the borehole field may be some distance away and need its own small supply. Laboratory instruments and IT equipment are sensitive to supply quality and benefit from local UPS units.

Treat the camp and water system as a separate priority group. Water for the process and for people should be protected; office cooling and recreation loads can wait during a generation shortfall.

Growing the load by phase

Many African lithium projects start with a modular plant and expand once offtake and finance are in place. Power demand can therefore double or triple over a few years. Designing the first station as if it were the last usually means either an oversized plant early on or an expensive rebuild later.

A better approach is to fix the layout, switchgear arrangement and fuel system for the final size, then install generating units in blocks. Our guide to planning a station in phases shows how foundations and busbars can be prepared for later units.

Supply options for each stage

Containerised high-speed diesel sets are quick to deploy and suit construction, pilot plants and early production. As demand settles, medium-speed engines on heavy fuel oil often lower the fuel bill for a long-life base load, while gas engines or gas turbines fit sites with pipeline gas or LNG supply. Solar with batteries can cut fuel use on the daytime load.

The choice between containers and a permanent engine hall is covered in our comparison of containerised sets and powerhouses for mines. Most owners end up with a mix: containers first, then a permanent station with the containers kept as standby or moved to a satellite pit.

Reliability and the export schedule

Lithium concentrate is usually trucked to a port on a fixed schedule. Lost production days are hard to recover because shipping slots and offtake volumes are agreed in advance. That pushes owners to specify at least one spare generating unit beyond peak demand, so routine maintenance never forces a cut in throughput.

An operations and maintenance contract that measures availability, fuel consumption per unit of energy and response times gives the owner a clear view of whether the station is supporting the export plan.

Data to gather before design

Before any sizing is done, collect the motor list with ratings and starting methods, the planned throughput by phase, the site altitude and temperature range, fuel availability and road access, and the expected life of the pit. A process flow diagram with the main drives marked is often the most useful single document.

With that data an engineer can build a load profile, test restart cases and compare supply options on cost and reliability. Skipping this step is the most common reason a mine station needs costly changes within its first two years.

About the authors

Our mining power engineers prepared this page from their work planning, building and operating on-site stations for mines in Africa. USP&E carries the EPC and O&M responsibility on its plants and is not a broker; the company has 24+ years of delivery, 150+ power projects in 45+ countries and 25,000 MW contracted since 2002. How we deliver a complete station is described on our power plant EPC projects page.

Offices: Colorado Springs (1755 Telstar Dr, Suite 300), Knoxville (800 S Gay St, Suite 700), London (162-168 Regent Street), Johannesburg (22 Kildoon Rd, Bryanston), Cape Town (31 Brickfield Road, Woodstock) and China (No. 1 Ningzhou Road, Wuxi). Regions: USA | AFRICA | UK | UAE | CHINA. ISO 9001 and ISO 45001 certified.

Lithium mine power questions

Which lithium plant loads should be protected first?

Dense media pumps, flotation blowers and agitators, process water and safety systems are normally protected. Stockpile reclaim, workshops and office cooling can be shed first.

Why do crushers matter so much for generator sizing?

Crushers that restart with rock in the chamber draw very high starting current. The station must accept that step without a large voltage or frequency dip, which can set the minimum number of units online.

Can a lithium mine start on containerised diesel sets?

Yes. Containerised sets suit construction, pilot plants and early production. Many mines later add a permanent HFO, gas or hybrid station and keep the containers as standby.

Does solar make sense on a lithium mine?

It can reduce fuel use on daytime loads. Batteries help absorb cloud swings and support large motor starts, but the thermal plant still needs to cover night operation and long cloudy periods.

Plan power for your lithium project

Share the motor list, process flow diagram and production plan by phase, and our engineers will build the load profile and compare supply options for each stage of the mine.

You can reach the engineering desk on +27 10 822 2324, send drawings or data sheets to info@uspeglobal.com, or leave the details on the project enquiry form. Sets suited to construction and pilot plant power are shown in our current diesel generator stock.


Where we operate

USA | AFRICA | UK | UAE | CHINA

USP&E United States

Colorado Springs Office: 1755 Telstar Dr, Suite 300

Knoxville Office: 800 S Gay St, Suite 700

USP&E South Africa

Johannesburg Office: 22 Kildoon Rd, Bryanston

Cape Town Office: 31 Brickfield Road, Woodstock

USP&E United Kingdom

London Office: 162-168 Regent Street

USP&E China

China Office: No. 1, Ningzhou Road, Wuxi

Call:+27 10 822 2324  |  E:info@uspeglobal.com

ISO Certifications
ISO9001ISO45001

Powering Possibility. Built for the Frontier.
Full-service EPC & O&M. Not a broker.

© 2026 USP&E · Africa Generators is part of USP&E